Tuesday, May 31, 2011

Day 29 - Lighting works has begun....

It is day 29 of the renovation works. We were half expecting only painting works to continue today but we got a surprise.

Lighting works for our home has begun. Most of the LED Downlights and Cove Lights have been installed. We were very happy and glad that the LED downlights themselves were pretty bright and able to light up the living room comfortably; and with the cove lights it is surely bright enough if needed to light up the whole living room.

The LED downlights and cove lights for the master bedroom is also installed. We were so happy to see the lighting works; and once the switches is up, we would not need to bring a torch to our home when we visit it at night.. :)

Here are some pictures below..



Monday, May 30, 2011

Day 28 - Painting works commenced, Lighting ariived and Piping for kitchen stove and sink done...

It is day 28 of the renovation works. Painting works has commenced and the primer coat for most rooms has been done. Once that is done, another major part of the renovation works, carpentry, will begin.

Before that, the electrician will also firm down the various electrical points for the house and fix up the lighting which has just arrived today. Finally, we would be able to have lights when we visit our home. :)

The kitchen sink and stove piping are also done. Now it seems most of the jobs will slowly coincide with one another; and our ID must ensure that the works flows smoothly without mistakes.

Below are some pictures....


Thursday, May 26, 2011

Day 24 - Plumbing works has begun... Shower fixtures done...

It is day 24 of the renovation works. Plumbing works for our home has begun. We saw the piping for our water supply to the sink in the kitchen has been done.

In our bathrooms, the hansgrohe shower fixtures have also been done up. With the shower system in the common bathroom and the rain shower system in the master bathroom.

Our water storage heater has been placed in the common bathroom (even though the initial idea was to have it in our kitchen). After discussion with my ID, she proposed it to be in the common bathroom because it would not make the kitchen look ugly and it would be easier to use the water piping that hdb has provided instead of extending them.

Here are some pictures..



Tuesday, May 24, 2011

Day 22 - Kitchen Tiling grouted and Master bedroom timber flooring almost done

It is day 22 of the renovation works. Our ID informed us that the timber flooring for our master bedroom would be done by today. At first I didn't believe it but when we went to have a peek in the evening, we were happily surprised that they have laid it nicely and left with some skirting works.

Our kitchen floor tiles are also grouted and covered nicely. A clear indication that carpentry works is going to commence soon. We also noticed that the bathroom and kitchen accessories that we have previously ordered were delivered today along with our oven and hob...

In summary, our flooring for the whole house is almost complete. :) One major part of the works done...

Here are some photos..



Monday, May 23, 2011

Day 21 - Kitchen Tiling works almost complete and Master bathroom tiles grouted

It is day 21 of the renovation works. Our kitchen tiling works is almost complete and left with grouting to be done to it. To us, we love the looks of it.

The foyer tiles are also complete right up to the door.

Our master bathroom has also been grouted. The accent looks great... feel very inviting and comforting.

Below are some photos taken (the iphone quality at night does not do the tiles justice.)...



Sunday, May 22, 2011

Day 20 - Bathroom kerbs being built and Kitchen floor tiles on-going...

It is day 20 of renovation works and progress seem pretty ok thus far.

The tiling works for both bathrooms seem to be done and now they are doing the kerbs for the glass shower screen for both bathrooms. If you noticed, the kerb is being built with a recess that would accommodate the shower screen to keep the shower screen guide hidden so that it does not have sharp edges appearing. It is a simple idea but time-consuming to construct; and I must thank my ID for looking into such details for us.

My favourite place, the Kitchen, is also having its floor tiles being laid. These tiles are our favourite. It has the wood grain look but are actually homogeneous tiles. Though they cost the most, they are definitely worth it. The carpentry works would be covering all the visible wall tiles (assured by my ID) with stainless steel backing for the work areas. I am really looking forward to see the kitchen being done up... (for the whole house as well!!)

Some pictures for viewing...


Friday, May 20, 2011

Day 18 - Master Bathroom almost complete and Foyer tiling has begun

It is day 18 of renovation. All of the tiling works for the living room, dining area, study room as well as 2nd bedroom are done. :) All that is left is the grouting work for the tiled rooms.

Tiling works for the finer details of our Master Bathroom has also begun. Due to HDB rules, we have to build a kerb for our shower area in order to accommodate the glass panel. If you notice, our glass will be recessed in a gap of the tiles...

Tiling works for our foyer and kitchen has also begun. This is our favourite tile and we think it looks fantastic...

Below are the photos we took...