It is day 45 of our home's renovation. As the day draws nearer to the proposed handover date, we get more excited each day looking at how our home is turning out.
Works to the common bathroom is complete with the installation of our WC and the racks and accessories.
Our master bathroom still requires some works as we change the basin hence the vanity top needs to be changed but the WC and racks are installed.
Below are some photos.
No comments:
Post a Comment