3rd May 2011 - Renovation officially started

The renovation works that we have been waiting for has started. Today is the first day of the works; hence mainly hacking works and removal of toilet stuff 'cos we are replacing majority of the items.

Below are some pics of the works done.

You can see that the floor tiles are being hacked away 'cos we are using another tile over them. The wall tiles are not touched as the design we have will cover almost the whole wall tiles.

Master Bedroom Bathroom door are removed, WC and wash basin removed too.

Common Bathroom door removed, WC and wash basin removed too.


Here are the stuff that are removed from the toilets.