Wednesday, May 4, 2011

Day 2 - Tiles have arrived (along with sand and screed)

Its day 2 of the works and to our surprise, our floor and wall tiles have arrived and neatly placed in the master bedroom along with sand and screed for the layering of the floor before tiling.





Most of the hacking works are done as far as I could tell. The ID informed us that plumbing will soon commenced as well. We have decided to fit the water heater at the Service Yard area if possible so that it would not be constantly 'attacked' by the humidity and moisture in the common bathroom. However, we are not willing to sacrifice the laundry poles as well; hence our ID would get back to us on the feasibility of placing the water heater at the service yard.