It is day 7 of renovation and electrical wiring has commenced for the whole house. The wiring are done based on the drawings specifying the number of lighting we had as well as the number of wall-sockets we want.
We thought the wiring was done up pretty fast. By the time we got there in the evening around 6plus, the guy was doing up the wiring for the kitchen as well as for the main DB (but have not connected it up yet).
I think by tomorrow morning most if not all electrical wiring will be ready and our ID will inspect to see if any other points are required.
Below are some pictures we have taken of the wiring.
No comments:
Post a Comment